WALK-IN SHOWER REMODEL - WILMINGTON, OH
Schedule Your Consultation
Walk-in shower remodel - Wilmington (April 2026)
A Wilmington walk-in shower rebuilt from the waterproofing up, marble-look wall tile, mosaic floor, glass-block light, and chrome fixtures.
All selected photos are inside the finished shower: large marble-look wall tile, dark penny-round (or small mosaic) floor with centered drain, tiled bench under a textured glass-block window, chrome rain head plus handheld, and a clean curb/entry. Scope follows the shower, demo, Wedi/waterproof prep, plumbing adjustments (drain relocate/center, diverter/lines), tile, and finish, not a full bath vanity story.
Scope
- Shower demolition (including multi-layer board removal encountered on site)
- Reframe/prep and Wedi (or equivalent) waterproof shower system
- Plumbing updates: centered floor drain and shower valve/diverter work as installed
- Large-format marble-look wall tile and mosaic shower floor
- Built-in tiled bench
- Glass-block window integration in the shower wall
- Chrome shower trim: overhead head, handheld, and controls
- Glass enclosure / entry as shown at the opening
- Adjacent drywall/paint touch areas required to finish the shower opening
Team
Project lead: Jonah
Craftsmen: Karl, Mykelti